92 peratus projek M Zenya Mah Sing habis dilanggan

0

Kuala Lumpur: Mah Sing Group Berhad (Mah Sing) meraikan satu lagi pencapaian dengan merekodkan kadar pengambilan 92 peratus pada pembangunan terbaharunya, M Zenya.

© New Straits Times Press (M) Bhd

Source link

Leave A Reply
Bitcoin (BTC) RM407,444.72
Ethereum (ETH) RM7,706.50
Tether (USDT) RM4.39
BNB (BNB) RM2,624.06
USDC (USDC) RM4.39
XRP (XRP) RM9.53
BUSD (BUSD) RM4.38
Cardano (ADA) RM3.05
Solana (SOL) RM652.11
Dogecoin (DOGE) RM0.764274
Polkadot (DOT) RM17.65
Polygon (MATIC) RM1.09
Lido Staked Ether (STETH) RM7,697.46
Shiba Inu (SHIB) RM0.000058
Dai (DAI) RM4.39
TRON (TRX) RM1.08
Avalanche (AVAX) RM96.73